background

Articles

Water Works

Construction Of Water Towers In Doha And Mesaieed
R.C.C. Water Towers 5 Nos, .25 Million Gallons, 3 Nos, 0.5 Gallons with epoxy lining inside and about 40 M above ground level with all service pipe work.
Client: Ministry of Electricity & Water
Period: 1977-1980

Al Gharafa Reservoir Project Phase 2
2 Nos. R.C.C. reservoir each of 6 million gallons capacity with all associated pipe work.
Client: Ministry of Electricity & Water
Period: 1979-1981

Replacement Of Main Distribution Lines Project In Um Ghwelina
Lay 27 km of New DI Pipe water mains and lay 85 Km of copper pipes for 3500 house connections
Client: Ministry of Electricity & Water
Period: 1986-1988

Abu Fentas Auxiliary Project  (C87076/12
Supply and applications of anticorrosion treatment to distillate water main at Desalination Plant
Client: Ministry of Electricity & Water
Period: 1982

Secondary Water Grid Development Project In Neaija
Lay 24.5 Km DI pipe and all associated works including construction of valve, hydrant chambers house connections etc.
Client: Ministry of Electricity & Water
Period: 1988-1990

Secondary Water Grid Project In Industrial Area
Lay 25.8 Km DI pipe line and all associated works including construction of valve, hydrant chambers house connections etc.
Client: Ministry of Electricity & Water
Period: 1988-1990

Roads works

 

Al Salam Road in Al Rayyan Area
Infrastructure Works and Road Works
Client: Ministry of Municipality Affairs and Agriculture
Period: 1998

Ground Works Project for QAFCO’s farms in Mesaieed
Infrastructure Works and Road Works
Client: NODCO
Period: 1999-2000

Estuaries project C282 in West Gulf Street 
Infrastructure Works and Road Works
Client: Ministry of Public Works & Highways
Period: 1996-1997

Estuaries project C283 in West Gulf Street 
Infrastructure Works and Road Works
Client: Ministry of Public Works & Highways
Period: 1996-1997

Access Road to farm 295
1.2 km Excavation and Asphalt
Client: Mr. Abdulla Ahmad Almustafawi Al Hashemi 
Period: Aug 2015- Oct 2015

 

 

 

 

 

 

 

Electricity Works

Installation and connection of cable DT/99 project
Installation and joining of 11 KV and 1,100V cables, delivery and erection of 11,000V and 415 /240 V Substation plant and equipment and the construction of indoor and outdoor 11,000V/ 415 V substations
Client: Ministry of Electricity & Water
Period: 1979-1980

Ras Abu Fentas project C 8076/4
Supply and install equipment for Ras Abu Fontas power and water generating station electrics.
Client: Ministry of Electricity & Water
Period: 1983

M.V. Reinforcement DT/11
Installation of LV and MV Electrical cables in Doha for a period of one year
Client: Ministry of Electricity & Water
Period: 1984
 






 


 




 

Water Treatment Works

Doha Sewerage Scheme C100/1
48 Km twin 800 mm Dia DI pipeline & 9 Km of twin 800 mm dia GRP pipe and associated valve chambers
Client: Ministry of Industry and Public Works
Period: 1981 – 1983

Doha Sewerage Scheme C 227
11 Km of effluent water pipeline and sprinkles from Almana Roundabout, C Ring Road
Client: Ministry of Industry and Public Works
Period: 1985-1986

Sewage Water Treatment Project – West Doha C312
12.6 Km of DI pipeline and 3.6 Km of GRP pipeline and all associated valve chambers
Client: Ministry of Industry and Public Works
Period: 1986-1988

Doha Sewage Project – Pumping Station No 33 (C150)
R.C.C Underground pump houses, road works etc
Client: Ministry of Industry and Public Works
Period: 1985-1987

Sewage Water Treatment Project – Doha C273
Refurbishment of Old Sewerage Services by replacing asbestos cement pipes with clay pipes.
Client: Ministry of Industry and Public Works
Period: 1988-1989

Sewage Water Treatment Project – Doha C242
Installation of surface water drainage system at the Cable & Wireless Roundabout area
Client: Ministry of Industry and Public Works
Period: 1989-1990

Al Shahanya Sewage Project Phase 2 C188
Construction of underground drainage system including clay pipeline and chambers
Client: Ministry of Industry and Public Works
Period: 1989-1991

Doha Sewage Project C274
In-situ lining of some 2361 m of PS 3 trunk sewer from 400 mm to 500 mm in diameter and renovation and lining of 40 No. manholes
Client: Ministry of Industry and Public Works
Period: 1990-1991

West Bay Sewage Grid Scanning Project And Various Works C357
The cleaning of approximately 40200 m of sewer and 960 manholes.
A conductivity survey to establish principal sources of infiltration.
An interval inspection by CCTV of approximately 40200 m of sewer.
The sealing of joints an approximately 8000 m of sewer.
A level, internal layout and condition survey of approximately 960 manholes.
Client: Ministry of Industry and Public Works
Period: 1990-1991

Doha Sewage Grid Scanning Project  Phase 3 C1/275
Doha Sewerage Scheme CCTV Survey Phase 3 Civil Project 275/1 CCTV Survey Works
Client: Ministry of Industry and Public Works
Period: 1991-1992

Excess Water Lines Project – Salwa C 209
The project comprises the construction of same 2.7 Km of trunk return effluent main and 4.3 Km of distribution return effluent mains. The mains are to be laid from the D Ring road, along the Salwa relief road to the existing Doha south sewerage treatment works.
Client: Ministry of Industry and Public Works
Period: 1991-1992

Surface Water Drainage Project – Central Doha C358
The project comprises the construction of some 1, 809 Km of surface water sewer and manholes associated land drains and gulley connections and relaying of 1.4 Km existing foul sewers and manholes. At Kharaba Street and Asmakh Street areas.
Client: Ministry of Industry and Public Works
Period: 1991-1992

Civil Works For Sewage Water Triple Treatment Project – West Doha C304
The works comprise the construction, completion, and maintenance of the following;
- Secondary Effluent Screw Pumping Station with inlet arrangement and channels.
Backwash return channels, tanks, sand traps and pumping sump arrangement. 
Final Holding Tank with backwash and chlorination pumping arrangements.
Rapid Gravity Sand Filters with inlet, backwash return and final effluent channels and chambers.
M.V. Switchgear room, Transformer Area, Control room, and all ancillary equipment, instrumentations, cabling and ducts.
Overall Pump Station structure, incorporating all lifting equipment, access levels and ways and all miscellaneous facilities such as store room, toilet, etc. 
All internal pipework, valves, penstocks, supports, and miscellaneous metal work.
All external works, including NEW HV room, site pipework, chambers, roads, lighting and cabling
Client: Ministry of Industry and Public Works
Period: 1992-1994

Front Drive And Drainage System Project – North West Doha C370
Installation of approximately 6.1 Km of twin 800 mm dia DI pipes of rising mains and 900 m of 1100 mm dia GRP pipes and all associated valve chambers and manholes
Client: Ministry of Industry and Public Works
Period: 1992-1994

 

Construction and Buildings Works





Al Andalus Villa Compound – Doha
64 Nos Double Storey Luxury Type Villas -swimming pool, squash court, tennis court, supermarket, club house etc.
Client: Abdullah A. Al-Mustafawi Al-Hashimi
Period: 1983-1985

New Al GhanemJadeed School Project
Double Storey School with total plinth area of 4300M2, complete with plumping, electrical and central A/C
Client: Ministry of Industry and Public Works
Period: 1981-1982

Experimental Solar Laboratory Project @ Umm Said
Control Building, Workshop Building, and 2 Nos. Water Reservoirs
Client: Industrial Development Technical Center
Period: 1984-1985

Daloop Project C 305-3
Two Storey Headquarter Building for Air Wing 72 m x 22 m on plan. Concrete + Block work Construction including specialised equipment installations.
Client: Qatar Armed Force
Period: 1991-1992

Water Tankers Filling Station Project – Al Khor
Elevated Water Tanks of 270 M2 capacity, tanker filling station and associated pipe works.
Client: Ministry of Electricity & Water
Period: 1983-1985

Water Tankers Filling Station Project - Salwa
Filling /station Office, 13 Nos, filling points, supply & lay 4.5 Km of 600 mm dia Ductile iron pipes etc.
Client: Ministry of Electricity & Water
Period: 1984-1985

Qatar Poultry Farm Project - UmQarn
Construction of 4 New Layer Farms new construction and modification of 9 broiler farms and modifications of 9 broiler farms and modifications of 5 parent farms, Hatchery and feed mill comprising: 51000 Cu M Excavation, 21000 Cu M Reinforced Concrete 1300 ton Steel Structures, 142000 Sq. M, Aluminum cladding, 70000 M Underground water, electric, telephone services, 9000 M Fencing 36000 Sq. M Roads and all associated building works
Client: Arab Qatari Co. for Poultry Production
Period: 1985-1988

US Army Warehouse In Siliya
Construction of Warehouse for US Army at Saliya
Client: US Army
Period: 1998-1999

Igloo for F16 Runway In Al Udaid
Construction of F 16 at the air strip in Al Udaid
Client: US Army
Period: 1998-1999

Emiri Air Force Headquarter In Doha International Airport
Construction of Headquarters of Amiri Air Force at Doha International Airport
Client: US Army
Period: 1994-1995 

Construction of Temporary of two (2) Car Park
Client: Private Engineering Office (PEO) 
Period: 2016-2017